This report provides a detailed view of actual hours charged, direct labor costs, labor category by Labor Cost Element and by person for the same time periods as the Project Cost Report. Average labor rate per cost element is also shown. If there are actuals that cannot be mapped to a cost element, these actuals will appear in the report in the "Unmapped Labor" section, and will be included in the report totals.
Only those project's having a Cost Structure indicated will be included in this report.
Actuals charged by users having a default Cost Structure / Cost Element definition (or project level override Cost Structure / Cost Element definition) will immediately appear on the Project Costing reports (that is, these reports include time having any timesheet status).
This report is available to users having any of the following roles: Administrator, P&R Administrator, and Project Administrators that also have the Cost Rate Manager role.
This report is available with the Project Tracking and Project Portfolio family of licenses. If the Project Portfolio license is in use, Labor Detail actuals can also be compared with Assignments or Plans.
Topics covered on this help page include:
Selection Criteria (options available to tailor report output)
You may also be interested in:
Project Accounting > Instructional Guide (additional Knowledge Center information)
Fiscal Year (Define Project Accounting Fiscal Year begin and end dates)
Cost Elements (Define list of Labor, ODC and Indirect Cost pools)
Cost Report (Define the list of Cost Elements, formula for sub-total and total lines to be included in your Project Costing reports)
Cost Structure (Define list of Cost Structures available in your Unanet installation)
Labor Cost (Specify Labor Cost elements available for a particular Cost Structure)
ODC Costs (Specify ODC Cost elements available for a particular Cost Structure)
Indirect Costs (Define the Indirect Cost pools and their formulas for a particular Cost Structure)
Indirect Cost Rates (Maintain the Target, Provisional and Actual Indirect Cost Rates for each Indirect Cost pool for a particular Cost Structure)
Labor Cost Post (Post Labor Cost information)
|